TULGACLOUD

The Data Center Anatolia Has Been Waiting For.

Tier III-aligned. Solar-powered. Built in Sivas — at the crossroads of Europe, Central Asia, and the Middle East.

In Development — Investment & Partnership Inquiries Open

Why Sivas. Why Now.

Location

Sivas sits at the geographic center of Anatolia — equidistant from Europe, Central Asia, and the Middle East. For data sovereignty, latency optimization, and regional redundancy, the geometry is undeniable.

Infrastructure

High-altitude cooling advantage. Grid-connected with solar overlay. Fiber backbone access. Land availability at scale. The fundamentals that make a data center viable — and profitable.

What We're Building

Power & Cooling

  • Solar overlay on grid connection

  • High-altitude free cooling advantage

  • Redundant power systems

Capacity

  • Phase 1: 150kW–600kW

  • 4-phase modular expansion

  • Scales with demand

Design Standard

  • Tier III-aligned architecture

  • LEED-targeted certification

  • 99.982% uptime design goal

For Investors & Partners

The Opportunity

Central Anatolia has no Tier III-aligned data center. The nearest facilities are in Istanbul — 700km away. Regional demand is growing. The gap is real.

The Numbers

Phase 1 CAPEX: $3.2M — $5.2M Payback period: 4.2 — 5.8 years Revenue model: Colocation + managed services + disaster recovery Structure: Open to equity, debt, and hybrid arrangements

The Window Is Open. Not Forever.

TulgaCloud is in active development. Early partners shape the structure.

If the geometry makes sense to you — let's talk.